Junyoung Park

Research Log

A dated record of sensing-system development, testing, and field deployment at Chung-Ang University.

Year
Field Work

Long-Term Monitoring Installation at Seosomun Overpass

I installed a long-term monitoring system at Seosomun Overpass in Seoul on December 15, 2023.

Field Work

Seongsan Bridge North-Section Inspection

I returned to inspect the monitoring system on the north section of Seongsan Bridge in November 2023.

Development

Preparation of 20 Sensors for Bridge Load-Rating Evaluation

I prepared 20 sensors for bridge load-rating evaluation and delivered them to the partner company in November 2023.

Field Work

Transport Monitoring of Three Prefabricated Members

I installed sensors on three prefabricated members for transportation monitoring on August 26, 2023.

Field Work

Three-Sensor Installation for Bridge Load-Rating Evaluation

I installed three sensors for bridge load-rating evaluation on August 18, 2023.

Field Work

Sensor Installation for Bridge Load-Rating Evaluation

I installed multiple sensors for bridge load-rating evaluation on August 16, 2023.

Field Work

Five-Sensor Installation at Soongsil University

I installed five sensors at an engineering building at Soongsil University on August 9, 2023.

Development

senseQR Firmware Upgrade

I upgraded the QR sensor firmware in August 2023 and named the system senseQR.

Field Work

Port Sensor Inspection and Upgrade

I inspected the port monitoring system and replaced its sensor with an upgraded unit on July 21, 2023.

Field Work

Sensor Installation on Seongsan Bridge

I installed monitoring sensors on both the south and north sections of Seongsan Bridge on July 13, 2023.

Development

Prefabricated Member Transport Monitoring System

I installed sensors on a multichannel prefabricated member for transportation monitoring on June 10, 2023.

The system combined gateway data collection with web-dashboard visualization. The member was intended for installation on a bus-only lane.

Field Work

Seongsan Bridge Monitoring Site Survey

I conducted a preliminary site survey at Seongsan Bridge in Seoul on February 24, 2023, and planned sensor installations for both the south and north sections.

Field Work

Prefabricated Girder Lifecycle Monitoring Preparation

I installed sensors on a prefabricated girder scheduled for construction on February 24, 2023.

The monitoring plan followed the member from storage through transportation and placement at the bridge site.