Junyoung Park

Bridge Load-Carrying Capacity Evaluation System

This project develops a field sensing system for bridge load testing and load-carrying capacity evaluation.

Key Results

Problem

Bridge load-carrying capacity evaluation requires reliable field measurements, but conventional load tests can be limited by sensor installation constraints and short measurement windows.

My Role

System / Methods

Field Deployment

Data / Outputs

Funded by

  • Ministry of Land, Infrastructure and Transport (MOLIT)