Low-Power JANET Reinstallation at Incheon Port
1 / 3
I reinstalled the validated JANET board at Incheon Port on February 19, 2021.
The low-power installation operated without separate power infrastructure.
I reinstalled the validated JANET board at Incheon Port on February 19, 2021.
The low-power installation operated without separate power infrastructure.