Junyoung Park

Long-Term Monitoring Sites

Seosomun Overpass

Long-term cloud-connected monitoring deployment on a concrete overpass in central Seoul.

Jung-gu, Seoul, South Korea 2023.12.28 - 2025.02.06

Site Overview

Long-term bridge response monitoring using acceleration, strain, and temperature sensing.

Sensor / Equipment Setup

  • Three-axis acceleration, three-channel strain, and one-channel temperature measurement setup
  • Solar panel, battery housing, sensor enclosure, and cloud-connected field logger
  • Hourly 100 Hz measurement windows for long-term operation review

Development Highlights

  • Configured field deployment layout for an urban concrete overpass
  • Organized periodic measurement records and cloud-uploaded operation logs
  • Reviewed installation reliability, sensor placement, and field maintenance conditions

Installation Photo

Seosomun Overpass field monitoring installation
Seosomun Overpass field monitoring context.

Monitoring Results

  • Three-axis acceleration, three-channel strain, and one-channel temperature records
  • 100 Hz measurements collected in 10-minute windows every hour
  • Cloud upload status, system operation logs, and field maintenance records

Field Context

This site records the practical system configuration and field operation experience from a long-term overpass monitoring deployment in central Seoul.

Additional Installation Details

Detailed installation views of strain gauges, temperature sensor, accelerometer, target girder, and sensor enclosure
Sensor placement and installation details for the strain gauges, temperature sensor, accelerometer enclosure, target girder, and sensor housing.

I am deeply saddened by the May 26, 2026 collapse accident at the Seosomun Overpass demolition site, and extend my sincere condolences to the victims and everyone affected.